Pancho and Bruce were asked to fill the tanks with water.Pancho can fill the tank in X minutes alone,while Bruce is slower by two minutes to Pancho.

a.what part of the job can Pancho finish in one minutes?
b.what part of the job can Bruce finish in one minutes?
c.Pancho and Bruce can finish filling the tank together Y minutes.how will you represent algebraically.in simplest form the job by the two if they worked together?
Patulong mga master,salamat
 
alam ko yan! yan ang mga trick question sa math... iisa lng sagot dyan.. eto sagot..

pancho maybe better than bruce, but i dont really know, because they are not my friends.

problem solved! :)
 
Last edited by a moderator:
a. Filling the whole tank with water in a minute?
b. Filling half tank with water in a minute ?
And dito sa c: ? Pancho + Bruce / x minute = y minute? haha idk XD
 

Tap X can fill a tank in 10 minutes and tap Y can fill it in 15 minutes. How long will it take to fill the tank if both taps are on?
----
Tap X rate: 1/10 job/minute
--
Tap Y rate: 1/15 job/minute
---
Together rate: 1/x job/min
----
Equation:
rate + rate = together rate
1/10 + 1/15 = 1/x
Multiply thru by 30x to get:
3x + 2x = 30
5x = 30
x = 6 minutes (time to fill the tank together)
==============
 